LESLIE: Bill in Michigan is on the line. How can we help you today?
BILL: My wife and I built a house about 10 years ago and we have a 2-car attached garage. And the problem is is that the floor of our garage is not level. And so, when water drops off the car from rain or more particularly, ice and snow, it drops off onto the garage floor and starts to go in different low spots on the floor.
TOM: OK.
BILL: And a lot of it goes directly towards the wall of our house.
TOM: OK.
BILL: So I’m wondering if there’s anything we can do to correct that problem without having to remove the floor and replace it.
LESLIE: Can you use something like Abatron or Abocast – I forget which one is the leveling compound – but to build up more on one side? Or will that just automatically try to go flat?
TOM: You know, I’m thinking, Leslie, it’s so much work to be able to deal with a surface this big, to try to get it level again.
I actually think, Bill, it’s frankly going to be easier to tear out the old floor. That might seem extreme but you may be surprised that with the right tool, like a jackhammer, you can have your entire floor torn out in a couple of hours. It breaks up really easily. And then you can properly level it, properly reinforce it and then repour it and be done.
BILL: I was afraid you were going to suggest that. Because the problem is is the floor is sitting on precast concrete beams, because we have a spare storage space underneath the garage. And so the water drips down there.
TOM: Ah. Oh, man.
BILL: So, I could do that, I guess, but I don’t know the likelihood of being able to take concrete off of those precast …
TOM: Yeah, that does – no, that dramatically – I was thinking it’d be over fill dirt like every other one.
BILL: Yes.
TOM: But no, that does make it a lot harder. So I guess you are going to have to look into a floor-leveling compound for this. And there’s a variety of products out there that this can work with. But the key is is it’s not just more concrete; it’s a product that’s designed specifically to stick to the existing concrete floor.
BILL: OK.
TOM: Because you have the full temperature swing there in Michigan and if you don’t have good adhesion, you’re obviously going to have that second layer chip off. So, it can be done. It’s a bit of a pain in the neck but it definitely can be done.
BILL: Would you suggest a concrete contractor? Do you think they would be familiar with the options there?
TOM: You may be better off having a pro do it, because you really have to set some forms to get this leveled just right. And then you remove them as you go so that it drains (inaudible at 0:18:13).
BILL: Oh, how much could you put on top of a floor that I described?
TOM: Oh, you could put 2 or 3 inches, easily.
BILL: OK. OK. I appreciate that.